SERVICES

ENGINEERING DESIGN AND CONSULTANT

ENGINEERING DESIGN AND CONSULTANT

LTE can develop basic engineering, detail engineering and shop drawing preparation of fired heaters based on data received from client .

FACTORY MANUFACTURE AND INSPECTION

FACTORY MANUFACTURE AND INSPECTION

The Company has the ability to supply fired heaters in fully modularized condition, and accumulated lots of experience. We can design the heater sections/modules based on heater dimension, site loading condition and transport condition.

KEY PROCESS

KEY PROCESS

Welding quality is the base of our product quality. The Companys welding quality has a good reputation among clients.

ON-SITE INSTALLATION AND CONSTRUCTION

ON-SITE INSTALLATION AND CONSTRUCTION

To meet the requirements of P+C Contractor of integrated fired heaters, and with the support of clients and engineering companies, Liantong successfully expanded the business to site construction from 2009.

Base on Technology Enhance Core Competitiveness

INTEGRAL DELIVERY OF HEATING FURNACE

Project Name: Petronas Rapid Project

Buyer: Petro-Chem Development Co.Inc.

Contractor: Sinopec Engineering (Group) China Co., Ltd.

Supplier:Ningbo Liantong Equipment Group CO.,LTD.

Package size (length X width X height) cm.   NET WEIGHT (K GS)   TOTAL WEIGHT(KGS)

2495 x 1628 x 2599                               878964                      978000

2495 x 1628 x 2599                               878964                      978000


Integral delivery of heating furnace

The delivery modularized the heater, including complete radiant section and convection section. Make it as fully modularized heater, including coil, burners, refractory and all other internal installed already for ocean delivery to site.This solution can greatly reduce site construction work and period.

Hardware Support : Xiangshan Xize Port depth of water 12.5 meters wharf holds 10,000 tons, SPMT Axle transporter.